CMH Home
CMH Home
Engineers in Korea
Pukhan River Bridge Construction
  • Image ES42-1-168

    Crane being used to handle cribs for underwater support of a bridge being built across the Pukhan River in the 8th ROK Division Sector in Korea, by personnel of the 378th Engineer Combat Battalion, 8th Army, attached to the IX US Corps. 19 Nov 1951.

  • Image ES42-1-337

    Personnel of the 378th Engineer Combat Battalion build cribs, which when filled with stones will be used as underwater supports for a bridge being constructed across the Pukhan River. 19 Nov 1951.

  • Image ES42-1-339

    Men of the 378th Engineer Combat Battalion, 8th US Army, attached to the IX US Corps, place a log crib which will be used as an underwater support for a bridge being built across the Pukhan River in the 6th ROK Division Sector, Korea. 19 Nov 1951.

  • Image ES42-4-68

    Personnel of the 378th Engineer Combat Battalion pull bridge sections into place during the construction of a bridge across the Pukhan River. 19 Nov 1951.

  • Image ES42-4-84

    Bridge section being unloaded at site of bridge being built across Pukhan River by personnel of the 378th Engineer Combat Battalion. 19 Nov 1951.

  • Image ES42-4-82

    Men of the 378th Engineer Combat Battalion install treadways during the construction of a bridge across the Pukhan River. 19 Nov 1951.

  • Image ES42-4-83

    Personnel of the 378th Engineer Combat Battalion place bridge sections into place on the Pukhan River. 20 Nov 1951.